Harness-engineering
2 articles
We Built a Harness Before It Had a Name
Before Faros, before arXiv, before Strapi — there was a .claude/wiki/ directory. Four projects, four generations of evolution, one conclusion: the most effective harness for AI agents is the one you build from your own mistakes.
Why AI Agents Need a Harness, Not Just a Prompt
Prompt engineering was 2023. Context engineering was 2024-2025. The next phase is Harness Engineering — building the runtime environment that makes AI agents reliable, verifiable, and controllable in production.